1. Home
  2. Build Series
  3. Build Series: 19 – Final Welding & Fabrication
  Previous Video Build Series: 18 – Engine Accessories
  Next Video Build Series: 20 – Powder Coat & Body Attachment
0

Build Series: 19 – Final Welding & Fabrication

1.63K
0

Moving on to final welding & fabrication, the chassis is attached to a rotisserie where it can be welded from any angle.

Some minor fabrication is also performed to the underside of the chassis where the floor stiffening strips are completed as well as the removable transmission cross member.

After all remaining welding & fabrication is complete, the chassis is cleaned up and prepared for the powder coat process.

TMRC’s Door Slammer Build Series provides unprecedented access with a detailed look into every aspect of building a modern door slammer.
From the chassis table to body mounting, interior, paint, final assembly through initial testing at the race track, you will get to see it all take place in over 20 episodes of high definition video!

PRODUCTS USED OR RELATED TO THIS VIDEO

Floor Stiffening Strips
FLOOR STRIPS
Removable Cross Member Kit
REMOVABLE CROSS MEMBER
Chassis Kit Tutorial Video
CHASSIS KIT TUTORIAL
Pro Mod Chassis Blueprints
CHASSIS BLUEPRINTS